BMS Cycling
1999 Results
Central Coast Double Century
Home Up Brian's Video Intended Use Privacy Policy 6.5 Earthquake
Home
Up
Our Volunteers
Course Details
Map
Elevation
Accomodations
CTC Schedule
CCD Top Riders
Rider Experiences
Links
2009 Photos
Contact Us

Requires a Java Enabled Browser.

CCD Thanks
our sponsors
for their
support!

 

 
Courtyard
by Marriott

120 S. Vine Street
Paso Robles,
CA 93446
(805) 239-970


BestBikeZone
712 Paso Robles St.
Paso Robles,
CA 93446
(805) 237-2453
(877) 944-2453


 K-Man's Cyclery
  9530 El Camino Real
Atascadero, CA.
93422
805-461-8735


Ultra Cycling


E-CAPS


Hammer-Gel

Click on images
above to visit
our sponsors.

 


 


The 17th Annual CCD Stage ride.
Ride Date: May 7, 2011
 

1995 Results 1996 Results 1997 Results 1998 Results 1999 Results 2000 Results 2001 Results 2002 Results 2003 Results 2004 Results 2005 Results 2006 Results 2007 Results 2008 Results 2009 Results 2010 Results

THE 1999 CENTRAL COAST DOUBLE RIDE RESULTS
SATURDAY MAY 8, 1999

colorbar.gif (4491 bytes)

131 Registered,  115 riders started, 102 Finished. 10 DNF. 3 IF (Incomplete Finish)

Total Distance: 209.5 miles
Total Elevation Gain: 13,800 ft.
Total Distance To Lunch: 113.3 miles
Departure Time: 0540
Total Elevation To Lunch: 8200 ft.
Distance After Lunch: 96.2 miles
Total Elevation Gain After Lunch: 5000 ft.
(T) = Tandem (R) = Recumbent
                                                                      Total     
                       Check    Time         Check      Check   Time   Time     
                       in to     to    Lunch  out       in to	From  Minus     
Name                   Lunch    Lunch  Stay  Lunch     Finish  Lunch  Lunch     
----------------------------------------------------------------------------       

 

Click here for text version

Hit Counter

Donate to
the CCD
Website
Back Home Next
 
Author: L. Sarver Last Modified :06/03/10 08:11 PM Copyright 2010